The ball rolls in the "crown" regardless of the weather

Produktanvendelse

Warsaw's brand-new National Stadium is among the most modern objects of its kind in Europe. It makes 58,000 seats available for football games and just under 73,000 seats for concerts. A technical highlight is the heatable playing surface atop an unheated underground car park. A heavy-duty insulation layer had to be put in for this purpose in-between its ceiling cover and the heating elements so that the heat gets to where it is actually needed. Thanks to their outstanding thermal insulation and high level of resistance to pressure, the large-format foam glass boards from Glapor Werk Mitterteich GmbH were used for the insulation of the oval. Because of its brittleness and disinclination to adhere, foam glass has to be embedded all over in bitumen adhesive during installation. The foam glass boards were bound together using the exceptional two-component bitumen adhesive for insulation boards PCI Pecimor DK from PCI Augsburg GmbH.

Dato

12.07.2012

Opgave

Perfectly insulating the new National Stadium

By

Warsaw

Udførelse

2012

Produktanvendelse

PCI Pecimor® DK

Konsulentbistand

Maciej Sawicki

Bygherre

Narodowe Centrum Sportu Sp. z o.o

Firma

Glapor Werk Mitterteich GmbH, Peter Berrer

Architect

gmp, Architekten Meinhard von Gerkan, Volkwin Marg und Partner (Entwurf) zusammen mit JSK Architekci, Warschau und Schlaich Bergermann und Partner, Stuttgart

Din kontaktperson for spørgsmål:

PCI Augsburg GmbH
Piccardstraße 11, 86159 Augsburg
Telefon: 0821 5901-0
Telefax: 0821 5901-416
E-Mail: pci-info@pci-group.eu
www.pci-augsburg.de

Referencerapport download

Indtryk