Simplicity requested

Produktanvendelse

In 2011, the priest community of the East Germany Focolare Movement, Fokolarbewegung Ostdeutschland e.V., bought the former parish church St. Pius X, located next to their meeting centre in Zwochau and redesigned it in terms of their spirituality. This house of prayer, since then entrusted to the protectorate of the Holy Trinity, should be kept as simple as possible. Under the direction of the Elmar Paul Sommer architects from Monschau / Eifel, the overall floor design plan was developed bearing the idea of using the exposed concrete with its functional look. This work was carried out by the Bad Köstritz based painting company O'Color Maler- und Lackierhandwerk Oliver Kowalski in close cooperation with PCI specialist Jörg Schulze.

Dato

10.05.2012

Opgave

Covering the church flooring with exposed concrete and an admixture of black pigments

By

Zwochau

Udførelse

2012

Objektstørrelse

200 m²

Produktanvendelse

PCI Armeringsvæv, PCI Gisogrund® 404, PCI Finopur®, PCI Pecitape Silent, PCI Zemtec 1K, black pigments

Konsulentbistand

Mr Jörg Schulze, PCI specialist

Bygherre

Fokolarbewegung Ostdeutschland e.V.

Firma

O'Color Maler- und Lackierhandwerk Oliver Kowalski, Bad Köstritz

Architect

Elmar Paul Sommer, Monschau / Eifel

Din kontaktperson for spørgsmål:

PCI Augsburg GmbH
Piccardstraße 11, 86159 Augsburg
Telefon: 0821 5901-0
Telefax: 0821 5901-416
E-Mail: pci-info@pci-group.eu
www.pci-augsburg.de

Indtryk